Total Budget: $12.8 Million

  • Telephone/Data
  • Electrical
  • Sewer/Storm Drainage/Gas
  • Replace Campus Site Finishes

Funding:

  • Bond Measure S (Ex. B #25): $12.8 Million

Schedule:

Electrical:
  • Design: 05/2005 - 3/2008
  • Bid/Award: 05/2006 - 05/2008
  • Construction: 09/2006 - 09/2010

        Design:  Lucci & Associates

 Gas:

  • Design: 02/2012 - 04/2012
  • Bid/Award: --
  • Construction: --
        Design: Bud Long & Associates
mc_ii1.jpg
 
mc_ii2.jpg

Project Objectives & Notable Features:

  • Telephone & data switch;
  • Electrical systems;
  • Water systems;
  • Sewer and storm drainage;
  • Gas distribution system: To replace all existing gas lines within campus to upgrade for size and type of piping.